The most accurate CGI system available is still the most affordable.
MJB INTERNATIONAL selects Paragon/Truebuild
for gas turbine MRO facility in Dubai, UAE
Application: Gas turbine rebuilding, GE Frame 3,5,6,7,9
CGI: Paragon V2.0PG Stacking: TrueBuild V1.2PG
Table: NT air bearing, 1500mm diameter, 10,000 Kg capacity, integral X-Y centering, RO<.000030"
Accessories shown:
Leveling system and fixturing
Four independent 110" column/arm units
Laser reference generators
Other software and hardware packages are available to suit your application.